Simulated data, except tab 6. Tab 6 shows Eskom's published demand forecast. Everywhere else, every volume, price, bid and meter figure is generated by a seeded simulator (SIM). Trader names are real licensees or applicants but their figures here are not theirs. Eskom tariffs, loss factors and TOU windows are the published 2026/27 values.
Market status, checked 6 October 2026. SAWEM has not launched and phase one admits only Eskom Generation and Eskom Distribution; the Market Code and trading rules are not yet gazetted. Bilateral wheeling has been live since 2023 and does not wait for any of it, so this venue runs on the bilateral path. The BRP declaration steps shown here are the Market Code Rev 2.1 procedure as drafted, not yet in force.
Supply vs demand balance
National, hourly MW · dashed = seasonal-naive forecast · shaded = TOU tier of each hour
Available supplySystem demandForecast 12 hPeak hours
Generation mix
Current dispatched output by source
Demand by sector
Share of current national demand, MW · indicative split SIM
TOU schedule today
Eskom 2026/27 Appendix A windows, this day type
System alerts
Rule engine · evaluated each tick
Data source connectors
Swap mode:'sim' for mode:'live' plus credentials per connector. See ARCHITECTURE.md.
Source
Provides
Cadence
Auth / licence
Mode
Where each trader's energy goes, D+1
MWh · contracted offtake, network losses, curtailment, surplus offered to the exchange
ContractedLossesCurtailedSurplus
Hourly portfolio position, D+1
All 21 traders · positive = surplus to clear, negative = shortfall exposed to SAWEM balancing
PeakStandardOff-peakShortfall
Trader register
D+1 day-ahead position per trader, MWh SIM · status column is the real licence position as far as public sources show
Auction controls
Uniform-price sealed bid, one auction per TOU block of D+1
Venue, never principal. Avela matches licensed sellers with off-takers and takes a per-MWh fee from buyers only; sellers list surplus free. It holds no position. Whether operating this venue needs its own NERSA trading licence under the October 2025 Rules for Electricity Trading is open, and a legal opinion is a pre-launch gate.
Order book and clearing, D+1
Delivery day
Order book
Submit a bid
Local simulation only. Nothing leaves this browser.
Carbon offset estimator
CO2e = MWh cleared × grid emission factor. Each MWh carries one REC ID, claimable once.
0
Attributes double-count when an off-taker's wheeled PPA already claims the same MWh. The ledger issues one REC per cleared MWh and blocks a second claim on the same ID.
Timeline the draft Market Code requires (not yet in force)
Market Code Rev 2.1, cl. 9.2: a bilateral trade not confirmed by both BRPs by 10h00 D-1 is negated by the Market Operator.
Meter audit trail, September 2026 billing period
Generator meter vs check meter vs Eskom wheeling credit, per trader SIM
Line-loss accounting, D+1
Loss factor = DLF (66-132kV urban 1.0724) × TLF for loads by zone
Cleared trades and billing export
One row per accepted bid · REC IDs · Avela fee
Synthetic plant. Plant A, a 100 MW plant, shown as wind only, solar only, wind + solar, gas only, concentrated solar (CSP) with molten-salt storage, or a full portfolio of all four, with or without a 20 MW / 12 MWh battery on the wind and solar, invented data SIM. When the System Operator instructs a plant to reduce output, the energy it could have produced is lost to the plant and may be claimable under its PPA. This lab shows where that energy goes, live, and then traces each event from instruction to cash.
Real-life situations, one click
Each button sets the plant, the weather and the battery to a situation an operator meets. Then watch the rand figures and flip the battery switch on the model SIM
Pick a situation above to start the story.
This 3D view needs WebGL, which this browser or device has switched off. The live graph and the claim register below work without it.
Live telemetry: inputs and outputs
Plant A, MW · time-compressed, 1 second = 1 minute of plant time · last 2 minutes shown SIM
Input: everything availablesolar PVCSPgasOutput: exported to the gridStored in batteryHeld back, not lost (gas not burned, heat stored)Lost under instructionNTCSA instruction active
Plant type
What it is worth in rands
Rates measured live from this plant while instructions run, then scaled to a year SIM · use the plant's own instructed hours from its NTCSA log for a real figure
What a battery changes: leakage from curtailment
Same 100 MW, same instructions, two compressed days (300 s of the demo schedule) SIM · leakage = energy lost to curtailment as a share of what the plant could have produced
How the energy is lost
01Wind and sunTurbines and panels could produce the blue line, measured from SCADA and met data.
02InstructionNTCSA sends a set-point by control system, dispatch or phone.
03ThrottleBlades pitch out of the wind and inverters back off the panels. Output follows the set-point, not the wind.
04LossAvailable minus exported minus stored in the battery is the energy lost, the amber area.
05ClaimLost energy times the PPA tariff is claimed, then paid as an estimate and trued up.
The invented week, hour by hour
Plant A, 100 MW wind and solar, six events · select a row to see its evidence chain SIM
AvailableMetered exportLost under instructionInstruction window
Claim register
Lost energy, value at the tariff above, estimate paid so far, status
Where the numbers come from
Public sources behind the inputs. NTCSA does not publish event-level curtailment logs or a national curtailed-energy total, so the plant, the week and the claim register stay invented and only the settings below are anchored to published figures
Input in this lab
Value used
What the public record says
Tariff default
R0.60/kWh
Recent REIPPPP solar bids: about R0.42 to R0.51/kWh in Bid Window 7 (8 projects R0.42 to R0.49, 6 later additions about R0.50); round 6 averaged R0.49. Plants from earlier rounds have different tariffs, so use the PPA tariff. Source · DBSA list
Instructions, size and pace
set-point, 2 to 6 h
NTCSA's system operator reported curtailment of up to 3 GW in a single day in winter 2026, and instructions to IPPs rising from about 100 to over 1 000 a month. Claims under verification fell from about R2bn to R1.5bn by 24 July 2026. Source
Paid estimate, then verified
claim register
NTCSA moved to paying the estimated claim value up front with technical verification after, following a claims backlog in April and May 2026. Source
Who is compensated
per PPA
State-procured plants are paid deemed energy by NTCSA as the buyer. For private generators, compensation under oversupply instructions is set by the buyer or the bilateral PPA. Source
Planning level of curtailment
4%
NERSA approved congestion curtailment as a constrained-generation ancillary service on 29 April 2025 (valid to 31 March 2028), built on a 4% curtailment level for new wind in the Eastern and Western Cape, unlocking 1 580 MW. This lab loses more than 4% on purpose, to make the loss visible. NTCSA GCCA 2025 · NERSA reasons
Gas running cost
R6 084/MWh
Eskom's open-cycle gas turbine generation cost in 2025, mostly diesel (coal R546/MWh for comparison). A plant on piped gas will differ. Source
Home size
30 kWh/day
Eskom has long used about 30 kWh a day (about 900 kWh a month) for a household; independent estimates are lower, so the homes count is conservative. Source
Hours of instruction a year
300 h (slider)
No public total exists. Replace it with the plant's own NTCSA instruction log.
Battery
20 MW / 12 MWh
An invented size for the demo. It stores at most 12 MWh per instruction, so against a 4 h event it covers only a small share of the loss, which is the sizing point to make to a client.
Demonstration only. A real check uses the plant's own instruction logs, SCADA, meter data, PPA terms and NTCSA statements, under a written mandate. Compensation depends on each PPA and a verified claim. Avela's check is a technical reconciliation, not an audit opinion.
Real data. This tab uses Eskom's published hourly demand, demand forecast and renewable output, national, refreshed each time the data file is rebuilt. Nothing here is simulated. The surplus threshold is our estimate, not an Eskom or NTCSA figure.
Eskom hourly demand: last 7 days and the 7-day forecast
MW, national. Residual demand is what coal, nuclear, gas and hydro must supply after wind and solar. When it falls to the fleet's minimum output, wind and solar are curtailed. Amber bands are the forecast hours below the threshold.
Residual demand, actualResidual demand, forecast (dashed)Total contracted demand, actual and forecastSurplus thresholdSurplus-risk hours
Surplus alert settings
For a large power user that can switch load on when power is plentiful.
What this can and cannot do. Extra load in these hours absorbs national surplus that would otherwise be curtailed. It does not relieve local network congestion: energy held behind a full line cannot reach a load on the other side. The threshold is a working estimate; calibrate it against a plant's own instruction log.
Upcoming surplus-risk windows
Forecast hours from now with residual demand below the threshold
Alert to send to large power users
Nothing is sent from this page. Copy the text into your own email or message.